Blog, Site Works & DrainageCompaction: The Cheapest Quality Control on Any Site
Fill placed in one thick layer and driven over twice is not compacted. Everything built on it inherits the problem.
Read ArticleOK ESTATE Construction and Supply Limited
#9 Insights
What we have learned building in Uganda and South Sudan — foundations, structures, materials and site practice — alongside updates from the company.
Blog, Site Works & DrainageFill placed in one thick layer and driven over twice is not compacted. Everything built on it inherits the problem.
5 September 2026Read Article
Blog, Construction MethodsMost delays on small buildings are not slow work. They are trades arriving in the wrong order and undoing each other.
4 September 2026Read Article
Blog, Structural EngineeringThe 230 x 230 column is the default on half the sites in Kampala. Here is how load actually accumulates down a…
3 September 2026Read Article
Blog, Foundation EngineeringThree foundation types cover most of what we build. Choosing between them is a soil question and a load question, not a…
2 September 2026Read Article
Blog, Site Works & DrainageUndersized culverts are the most common drainage failure we are asked to fix. The pipe rarely fails — it just was never…
30 July 2026Read Article
Blog, Construction MethodsA wall out of plumb by 20mm costs money in plaster for the rest of the job. Blockwork quality is decided in…
22 July 2026Read Article
Blog, Foundation EngineeringA trial pit costs less than a day of plant hire. Skipping it is the most expensive decision on most Ugandan and…
14 July 2026Read Article
Blog, Structural EngineeringClients usually ask which is cheaper. The more useful question is which one your span, your programme and your supply chain can…
9 July 2026Read Article
Blog, Site Works & DrainageEvery dimension in the building is measured from decisions made in the first week. Errors here are the only ones you cannot…
1 July 2026Read Article