Compaction: The Cheapest Quality Control on Any Site
Fill placed in one thick layer and driven over twice is not compacted. Everything built on it inherits the problem.
OK ESTATE Construction and Supply Limited
#9 Insights

Fill placed in one thick layer and driven over twice is not compacted. Everything built on it inherits the problem.

Most delays on small buildings are not slow work. They are trades arriving in the wrong order and undoing each other.

The 230 x 230 column is the default on half the sites in Kampala. Here is how load actually accumulates down a frame, and when that default stops being safe.

Three foundation types cover most of what we build. Choosing between them is a soil question and a load question, not a budget question.

Undersized culverts are the most common drainage failure we are asked to fix. The pipe rarely fails — it just was never big enough.

A wall out of plumb by 20mm costs money in plaster for the rest of the job. Blockwork quality is decided in the first three courses.

A trial pit costs less than a day of plant hire. Skipping it is the most expensive decision on most Ugandan and South Sudanese sites.

Clients usually ask which is cheaper. The more useful question is which one your span, your programme and your supply chain can actually support.

Every dimension in the building is measured from decisions made in the first week. Errors here are the only ones you cannot correct later.

A 1:2:4 mix measured with a shovel is not a 1:2:4 mix. Here is what site batching really delivers, and how we keep it honest.